Svante
Process Plant Co-op
Svante develops carbon capture plants based on solid adsorbent technology. Working in the Process Engineering team within the Solutions Department, I contribute to early-stage engineering studies for industrial clients, from process simulation through cost estimation to client reporting.
- Process simulation: developed Aspen Plus models of a 417 TPD carbon capture facility, running parallel cases for two adsorbents and validating the results against R&D mass balances and client RFIs.
- Engineering deliverables: produced 15 process flow diagrams and the corresponding heat and material balances in Bluebeam, and built an electrical load list in Excel from simulated equipment duties and flow rates to quantify total facility power demand.
- Techno-economic analysis: evaluated CAPEX and OPEX for a 1,403 TPD capture facility treating refinery FCC flue gas, comparing a Base Case against an electrified mechanical vapour recompression (MVR) configuration.
- Client reporting: contributed to an FEL-0 client report on plant footprint, KPIs and scope, demonstrating that although the MVR design reduced steam demand by 48%, local electricity pricing made the Base Case the more economical option.
- Concept selection: compared cost estimates across six process configurations for an FEL-1 study, then prepared the block flow diagrams (Visio) and heat and material balances for the selected design.